Beach Rehabilitation and Monitoring at Marine Park, Bellingham

Marine Park was a heavily altered and popular shoreline park in the Fairhaven district of Bellingham. The Marine Park beach rehabilitation project was completed as part of larger Bellingham Bay wide habitat restoration efforts, in which CGS played a key role. CGS provided the beach restoration design for the design team that removed the failing revetment and replaced it with a gravel beach in fall, 2004. Approximately 7,000 cubic yards of rock, debris, and fill were removed from the site and a gravel beach extending down to +4 ft MLLW and up to a broad sand-covered backshore area was completed. CGS will perform annual post-project physical monitoring, including beach stability and the position of beach sediment relative to nearby eelgrass beds.
Marine Park after restoration Marine Park before Restoration
Marine Park After CGS Restoration
Marine Park Before CGS Restoration Project

CGS Home » CGS Projects » Beach Rehabilitation and Monitoring at Marine Park, Bellingham

Content managed by the Etomite Content Management System.